800-171 Evidence

October 29, 2026

What Goes Into a POA&M Entry for an Unmet 800-171 Requirement?

You have a requirement you cannot yet meet, and you need to write it down right.

Diagram showing the six parts of a POA&M entry: requirement, gap, risk, task, owner, and date

POA&M means Plan of Action and Milestones. NIST SP 800-171 sets out 110 security requirements. CUI means Controlled Unclassified Information. When a requirement is not met, the POA&M is where you own that gap in writing. NIST SP 800-171A describes how assessors check each requirement. Your POA&M should answer the same questions an assessor will ask.

The six parts every entry needs

First, name the requirement. Use its number, such as 3.5.3, and its plain title. Second, describe the gap in concrete terms. Say what is missing, and where. "MFA is not on all accounts" is concrete. MFA means multifactor authentication. "Access needs work" is not concrete.

Third, state the risk if the gap stays open. Name what an attacker could reach, or what data could leak. Keep it short and honest. Fourth, list the tasks that will close the gap. Each task should be one action, with one owner. Fifth, name the owner for the whole entry. Sixth, give a due date for each task, and a date for full closure.

What a weak entry looks like

A weak entry names no owner. A weak entry has no date. A weak entry lists a task like "improve security" with no action behind it. A weak entry copies the requirement text as the gap. None of these help an assessor. None of these help your own team either.

Fix weak entries before an assessment. Add the owner. Add the date. Split a vague task into dated steps. If a date must move, move it with a reason written down. A moved date with a reason shows control. A missed date with silence shows neglect.

Link the entry to proof on both sides

Link backward to the evidence that found the gap. That may be a self-assessment note, a scan result, or a log review. Link forward to the proof that will show the fix. That may be a new report, a ticket, or a rescan. When the fix is done, file that proof with the entry. Do not close an entry on a promise. Close it on proof.

Keep one entry per gap, not one entry per requirement, when a requirement has two distinct gaps. Two gaps with one owner and one date will blur. Split them, and each gap gets its own fix path. An assessor can then follow each gap to closure without guessing.

How to review your POA&M each month

Once a month, read every open entry. Check the owner still owns it. Check the date still holds. Check that at least one task moved since the last review. An entry with no movement for two months needs a new plan, not just a new date.

Bring the POA&M to team reviews. A gap that only one person knows about is a private risk. A gap the whole team sees is a shared task. That shared view is what turns a POA&M from a list into a plan.

Sources

Next step

Want evidence tied to each requirement from live systems? See how PolicyCortex collects it.